News

Construction of quays № 2, 3 at the facility: Logistics and industrial park of mineral fertilizers at Ust-Luga port
Customer: Ultramar LLC
Period: September 2020
Facility: "Range of works on construction of quays № 2, 3 at the facility: Logistics and industrial park (complex) for storage and transshipment of mineral fertilizers with storage facilities and rail infrastructure at the municipal settlement “Vistino village settlement” of the municipal entity Kingisepp municipal district of the Leningrad Region. Marine shipment terminal"
Jobs performed by SU GT Morstroy in September:
• Sinking hollow shell piles, 1420х18 mm in diameter, 34.8 m long. - 50 pcs (1107 tons);
• Sinking hollow shell piles, 1420х18 mm in diameter, 41.8 m long. - 1 pcs (26.59 tons);
• Sinking hollow shell piles, 1420х18 mm in diameter, 43.3 m long. - 31 pcs (794.53 tons);
• Testing the control hollow shell piles at static press-in load/pull-out load - 5 pcs.;
• Filling up the hollow shell pile cavities with sand - 96 pcs (2060 sq. m);
• Filling up the hollow shell pile cavities with concrete - 96 pcs (71.9 sq. m).