News

Construction of quays № 2, 3 at the facility: Logistics and industrial park of mineral fertilizers at Ust-Luga port
Customer: Ultramar LLC
Period: November 2020
Facility: "Range of works on construction of quays № 2, 3 at the facility: Logistics and industrial park (complex) for storage and transshipment of mineral fertilizers with storage facilities and rail infrastructure at the municipal settlement “Vistino village settlement” of the municipal entity Kingisepp municipal district of the Leningrad Region. Marine shipment terminal"
- Filling up cavities of the hollow shell piles (48 pcs):
• with sand (from -17.2m to -3m) – 710.2 cubic m.
• with concrete (from -3m to -2.5m) – 25.4 cubic m.
• with concrete (from -2.5m to +1.5m) – 291.6 cubic m.
- Installation of anchor systems with application of anti-corrosive proofing:
• 16 m long, mass 0.8 tons - 22 pcs.
• 19.2 m long, mass 0.9 tons - 18 pcs.
- Filling up cavities of the face wall’s tongue-and-groove tubular fabrication section (29 pcs):
• with concrete (from -2.5m up to +0.9m) – 143.9 cubic m.
- Filling up the cell hollow from tongue-and-groove tubular fabricated section:
• with sand (from -17.2m to -3m) - 7799 cubic m.
• with stone sand mixture (from -3m to -2m) - 582 cubic m.
• with broken stone (from -2 m to 0m) - 1096 cubic m.
- Fabricating and installing fasteners for hollow shell piles – 84.2 tons.
- Fabricating and installing cap plates (68 pcs) – 5.5 tons.