News

Construction of quays № 2, 3 at the facility: Logistics and industrial park of mineral fertilizers at Ust-Luga port
Customer: Ultramar LLC
Period: August 2020
Facility: "Range of works on construction of quays № 2, 3 at the facility: Logistics and industrial park (complex) for storage and transshipment of mineral fertilizers with storage facilities and rail infrastructure at the municipal settlement “Vistino village settlement” of the municipal entity Kingisepp municipal district of the Leningrad Region. Marine shipment terminal"
The Construction Company was working 24/7. The following was done:
• Diver inspection of the sea bed and removal of objects which hindered operations – 3.78 thous. sq. m;
• Testing the control hollow shell piles at static press-in load/pull-out load - 7 pcs.;
• Set of operations aimed at sinking a tongue-and-groove tubular fabricated section, 1420х16 mm in diameter, 36.75 m long, with ground drilling - 77 pcs. (1715 tons);
• Fabricating and installing fasteners of hollow shell piles – 112.98 tons.