Construction of quays № 2, 3 at the facility: Logistics and industrial park of mineral fertilizers at Ust-Luga port
Customer: Ultramar LLC
Period: January 2021
Facility: "Range of works on construction of quays № 2, 3 at the facility: Logistics and industrial park (complex) for storage and transshipment of mineral fertilizers with storage facilities and rail infrastructure at the municipal settlement “Vistino village settlement” of the municipal entity Kingisepp municipal district of the Leningrad Region. Marine shipment terminal"
The following kinds of activities were performed:
- Grouting pile cap – 1394.7 sq.m.
- Building expansion joints between sections – 234.3 sq.m.
- Installing bollards:
• drilling wells, 48 mm in diameter - 28 pcs. (24.5 m bore bit)
• filling up the wells – 54.3 cubic m.
• installing anchor bolts - 84 pcs.
- Installing fenders:
• drilling wells, 35 mm in diameter - 288 pcs. (80.6 m bore bit)
• drilling wells, 42 mm in diameter - 192 pcs. (78.7 m bore bit)
• drilling wells, 48 mm in diameter - 96 pcs. (57.6 m bore bit)
As well as other kinds of activities.