Construction of quays № 2, 3 at the facility: Logistics and industrial park of mineral fertilizers at Ust-Luga port

Customer: Ultramar LLC

Period: December 2020

Facility: "Range of works on construction of quays № 2, 3 at the facility: Logistics and industrial park (complex) for storage and transshipment of mineral fertilizers with storage facilities and rail infrastructure at the municipal settlement “Vistino village settlement” of the municipal entity Kingisepp municipal district of the Leningrad Region. Marine shipment terminal" 

- Filling up cavities of hollow shell piles (34 pcs.):

• with concrete (from -2.5m to +1.5m) – 206.4 cubic m.


- Fabricating and installing reinforcing cages, mass 1.6tons - 54 tons.


- Filling up the hollow of the cell from tongue-and-groove tubular fabricated section:

• with broken stone (from 0 to 0.8 m) - 440 cubic m.


- Grouting pile cap – 6823.8 cubic m.


- Drilling wells:

• Ø 35 mm - 288 pcs. (80.6 m bore bit)

• Ø 42 mm - 192 pcs. (78.7 m bore bit)

• Ø 48 mm - 96 pcs. (57 m bore bit)


As well as other kinds of activities.



See video of construction progress